Clogged Sewer & Camera Inspection In Cheshire, CT


Cabled main line inside building up to 120′ out to clear stoppage (tree roots) at foundation. Then Ran cable from outside clean out 167’out, located a belly at about 75′ out. Trenchless system is recommended and remove belly by digging up the sewer line and replace bellied section.

Leave a Reply

Your email address will not be published. Required fields are marked *